IMPLEMENTASI KONSEP BUILDING INFORMATION MODELLING (BIM) PADA PENGESTIMASIAN BIAYA PROYEK PEKERJAAN STRUKTURAL PEMBANGUNAN KANTOR DINAS PERIKANAN DAN PETERNAKAN KABUPATEN OKU

Rizky Tri, Pamungkas and Ir. Lindawati, Lindawati, M.T. and Azwar, Azwar, M.T. (2023) IMPLEMENTASI KONSEP BUILDING INFORMATION MODELLING (BIM) PADA PENGESTIMASIAN BIAYA PROYEK PEKERJAAN STRUKTURAL PEMBANGUNAN KANTOR DINAS PERIKANAN DAN PETERNAKAN KABUPATEN OKU. Other thesis, Universitas Baturaja.

[thumbnail of Cover Rizky Tri Pamungkas.pdf] Text
Cover Rizky Tri Pamungkas.pdf

Download (1MB)
[thumbnail of Abstract Rizky Tri Pamungkas.pdf] Text
Abstract Rizky Tri Pamungkas.pdf

Download (6kB)
[thumbnail of BAB I Rizky Tri Pamungkas.pdf] Text
BAB I Rizky Tri Pamungkas.pdf

Download (155kB)
[thumbnail of BAB II Rizky Tri Pamungkas.pdf] Text
BAB II Rizky Tri Pamungkas.pdf

Download (506kB)
[thumbnail of BAB III Rizky Tri Pamungkas.pdf] Text
BAB III Rizky Tri Pamungkas.pdf

Download (263kB)
[thumbnail of BAB IV Rizky Tri Pamungkas.pdf] Text
BAB IV Rizky Tri Pamungkas.pdf
Restricted to Repository staff only

Download (5MB)
[thumbnail of BAB V Rizky Tri Pamungkas.pdf] Text
BAB V Rizky Tri Pamungkas.pdf

Download (30kB)
[thumbnail of DAFTAR PUSTAKA Rizky Tri Pamungkas.pdf] Text
DAFTAR PUSTAKA Rizky Tri Pamungkas.pdf

Download (74kB)

Abstract

Along with the times, technology is developing very quickly. Technology is now a support in completing work in order to achieve more effective and efficient results. In the world of construction, technology is currently experiencing improvements and continues to grow along with the increasing number of infrastructure developments, especially in Indonesia. One of the technological innovations in the world of construction is Building Information Modeling (BIM), a technology capable of increasing work effectiveness. However, the application of Building Information Modeling (BIM) is still lacking in Indonesia. This study discusses the application of the Building Information Modeling (BIM) concept using Autodesk Revit software in the development project of the OKU District Fisheries and Livestock Service Office which from planning still uses conventional methods or calculations based on Autocad assisted with Microsoft Excel which allows human error to occur so that calculations The Budget Plan (RAB) becomes inaccurate. To generate data in the form of work costs with the BIM concept, first model the data that has been obtained from the project owner so that it will produce data in the form of work volume so that it can be calculated using Work Unit Price Analysis from project data so that it will produce a cost estimate. Based on the results of the research that has been done, the calculation results for structural work are Rp. 2,195,010,170.43.

Keywords: Building Information Modelling (BIM), Autodesk Revit, Estimated costs, Structural, RAB

Item Type: Thesis (Other)
Subjects: Universitas Baturaja > Jurnal > FTK > Teknik Sipil
UBR > Teknik Sipil
Divisions: Fakultas Teknik dan Komputer > Teknik Sipil
Depositing User: Yudith Unbara
Date Deposited: 14 Dec 2023 03:51
Last Modified: 14 Dec 2023 03:51
URI: http://repository.unbara.ac.id/id/eprint/1812

Actions (login required)

View Item
View Item