Kurniawan, Triputra and Azwar, Azwar, M.T. and Lucyana, Lucyana, M.T. (2024) ANALISA OPTIMALISASI BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN TANAH DI PROYEK JARINGAN IRIGASI SALURAN SEKUNDER SELEBANG DAERAH IRIGASI LEMATANG KOTA PAGAR ALAM. Other thesis, Universitas Baturaja.
cover skripsi Kurniawan Triputra.pdf
Download (716kB)
Abstrak Kurniawan.pdf
Download (177kB)
BAB I.pdf
Download (393kB)
BAB II.pdf
Download (2MB)
BAB III.pdf
Download (418kB)
BAB IV.pdf
Restricted to Repository staff only
Download (1MB)
BAB V.pdf
Restricted to Repository staff only
Download (155kB)
Daftar pustaka.pdf
Download (149kB)
| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | Universitas Baturaja > Jurnal > FTK > Teknik Sipil UBR > Teknik Sipil |
| Divisions: | Fakultas Teknik dan Komputer > Teknik Sipil |
| Depositing User: | Yudith Unbara |
| Date Deposited: | 22 Jan 2025 07:01 |
| Last Modified: | 22 Jan 2025 07:01 |
| URI: | http://repository.unbara.ac.id/id/eprint/2304 |
