Muhammad, Al-Fillah and Ir. Lindawati, Lindawati, M.T. and Azwar, Azwar, M.T. (2025) ANALISIS DAMPAK PEMBANGUNAN PERUMAHAN TERHADAP KONDISI LINGKUNGAN, SOSIAL DAN EKONOMI MASYARAKAT SEKITAR DI PERUMAHAN CENTER POINT KAPURAN. Other thesis, Universitas Baturaja.
Cover (halaman pengesahan DLL).pdf
Download (849kB)
ABSTRACT.pdf
Download (518kB)
BAB I (1).pdf
Download (439kB)
BAB II (1).pdf
Download (625kB)
BAB III (1).pdf
Download (775kB)
BAB IV (1).pdf
Restricted to Repository staff only
Download (1MB)
BAB V (1).pdf
Restricted to Repository staff only
Download (10kB)
Daftar Pustaka (1).pdf
Download (147kB)
Abstract
In accordance with the 6 (six) project completion paths above, it can be seen that the activities undertaken are more than one activity path. Activities that pass through more than one path are activities coded A, B, C, E, F, H, J, K, L and M. Meanwhile, activities coded D, G and I are not critical paths for the above activities because The fastest time or duration to complete is not the same as the longest time. So it can be seen that the project's critical activity path is A – B – C – E – F – I – J – K – L – M which is marked with a red arrow line. The results of the CPM analysis prove that the duration for the house construction project was completed faster than the specified time of 44 days, it could be completed more quickly to 39 completion days, so the time difference reached 5 days. the project which previously took 44 days became 39 days or 5 days faster. Based on the budgeted amount of Rp. 65,406,819 is greater than the realized costs of Rp. 60,320,299.00, resulting in a cost difference of IDR 5,086,520.29.
| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | Universitas Baturaja > Jurnal > FTK > Teknik Sipil UBR > Teknik Sipil |
| Divisions: | Fakultas Teknik dan Komputer > Teknik Sipil |
| Depositing User: | Yudith UNBARA |
| Date Deposited: | 21 Sep 2026 01:41 |
| Last Modified: | 21 Sep 2026 01:41 |
| URI: | https://repository.unbara.ac.id/id/eprint/2850 |
