ANALISIS DAMPAK PEMBANGUNAN PERUMAHAN TERHADAP KONDISI LINGKUNGAN, SOSIAL DAN EKONOMI MASYARAKAT SEKITAR DI PERUMAHAN CENTER POINT KAPURAN

Muhammad, Al-Fillah and Ir. Lindawati, Lindawati, M.T. and Azwar, Azwar, M.T. (2025) ANALISIS DAMPAK PEMBANGUNAN PERUMAHAN TERHADAP KONDISI LINGKUNGAN, SOSIAL DAN EKONOMI MASYARAKAT SEKITAR DI PERUMAHAN CENTER POINT KAPURAN. Other thesis, Universitas Baturaja.

[thumbnail of Cover (halaman pengesahan DLL).pdf] Text
Cover (halaman pengesahan DLL).pdf

Download (849kB)
[thumbnail of ABSTRACT.pdf] Text
ABSTRACT.pdf

Download (518kB)
[thumbnail of BAB I (1).pdf] Text
BAB I (1).pdf

Download (439kB)
[thumbnail of BAB II (1).pdf] Text
BAB II (1).pdf

Download (625kB)
[thumbnail of BAB III (1).pdf] Text
BAB III (1).pdf

Download (775kB)
[thumbnail of BAB IV (1).pdf] Text
BAB IV (1).pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB V (1).pdf] Text
BAB V (1).pdf
Restricted to Repository staff only

Download (10kB)
[thumbnail of Daftar Pustaka (1).pdf] Text
Daftar Pustaka (1).pdf

Download (147kB)

Abstract

In accordance with the 6 (six) project completion paths above, it can be seen that the activities undertaken are more than one activity path. Activities that pass through more than one path are activities coded A, B, C, E, F, H, J, K, L and M. Meanwhile, activities coded D, G and I are not critical paths for the above activities because The fastest time or duration to complete is not the same as the longest time. So it can be seen that the project's critical activity path is A – B – C – E – F – I – J – K – L – M which is marked with a red arrow line. The results of the CPM analysis prove that the duration for the house construction project was completed faster than the specified time of 44 days, it could be completed more quickly to 39 completion days, so the time difference reached 5 days. the project which previously took 44 days became 39 days or 5 days faster. Based on the budgeted amount of Rp. 65,406,819 is greater than the realized costs of Rp. 60,320,299.00, resulting in a cost difference of IDR 5,086,520.29.

Item Type: Thesis (Other)
Subjects: Universitas Baturaja > Jurnal > FTK > Teknik Sipil
UBR > Teknik Sipil
Divisions: Fakultas Teknik dan Komputer > Teknik Sipil
Depositing User: Yudith UNBARA
Date Deposited: 21 Sep 2026 01:41
Last Modified: 21 Sep 2026 01:41
URI: https://repository.unbara.ac.id/id/eprint/2850

Actions (login required)

View Item
View Item